
2026-10-27
7 Inspection Gates: From Drawing to Vacuum Chamber Delivery
A vacuum chamber is not "done when welded". We run 7 inspection gates from drawing to delivery — documented per unit, traceable for your equipment team.
Read article →NEWS · 新闻资讯
Technical articles and notes from the shop floor. Updated monthly — the questions equipment teams actually ask about vacuum chamber fabrication.

2026-10-27
A vacuum chamber is not "done when welded". We run 7 inspection gates from drawing to delivery — documented per unit, traceable for your equipment team.
Read article →
2026-10-27
Short answer: 304L covers most standard chambers; choose 316L when the process involves corrosive atmospheres or the drawing specifies it. Unsure? Put the operating environment in your RFQ and we will advise — not guess.
Read article →
2026-10-27
Short answer: send your drawing (PDF / DWG / STEP) and you get a substantive reply within 48 hours — drawing review, DFM feedback, quotation and a milestone schedule in one response.
Read article →